Atmosphere of the In-House Training: Extension of Time (EOT), November 15-16, 2023
The Extension of Time (EOT) training course, held on November 15-16, 2023, was conducted by Dr. Apirath Prateapusanond (Managing Director, Delay Analyst, and Construction Dispute Mediator).
Quantum PPP Consulting Co., Ltd. extends its gratitude to all participants and hopes that the knowledge gained will be beneficial for everyone’s projects.
________________
Follow QConZoL on other platforms:
ID Line: @QConZoL or click the link: https://lin.ee/zzpCXLc
Website: www.quantumppp.com
Facebook: https://www.facebook.com/QConZoL
YouTube: https://www.youtube.com/@qconzol9967
Tel: 02-026-6505
